DMS-RFQ-01 / EMAIL INTAKE
Put the specified component into review
Start a real-time contract manufacturing review with the component, quantity, process or material, and need-by date. Fit and next steps will be reviewed without promising instant capacity or lead time.
Name the part, quantity, controlling material or process, and required date. Specification fit is reviewed before capacity or timing is stated.
EMAIL BASIS
What belongs in the first RFQ?
NO CONTROLLED FILES: Do not attach technical, customer-restricted, export-controlled, classified, credential, or proprietary information to the first email.
DMS-RFQ-01 / EMAIL INTAKE
Start with the four fields that control the review.
Use the prefilled email to send the component, quantity, process or material, and need-by date. Add specification or revision status only at a high level.
- 01
- Component
- 02
- Quantity
- 03
- Process or material
- 04
- Need-by date
The specification desk will identify fit questions and the next controlled review. The first email does not commit capacity, pricing, or timing. Do not include CUI, classified, export-controlled, NDA-protected, proprietary, or other sensitive files in the first message.