Source approval
A visible component does not prove the authorized supplier, alternate, revision, or incoming evidence.
GUIDE DMS-G / PHYSICAL REFERENCE
A physical reference can reveal relationships, workmanship, routing, fit, and expected behavior. It cannot, by itself, identify approved material, revision effectivity, hidden process, software state, or release authority.
Name the part, quantity, controlling material or process, and required date. Specification fit is reviewed before capacity or timing is stated.
REFERENCE-UNIT ANSWER
Use it to compare the documented package against a known physical result and expose missing definitions. Do not let reverse interpretation silently replace customer-controlled requirements.
EXTRACT THE KNOWLEDGE
LIMITS
A visible component does not prove the authorized supplier, alternate, revision, or incoming evidence.
The completed assembly may not reveal preparation, cure, torque, calibration, or inspection conditions.
Observed behavior does not establish the controlling binary, configuration, loading method, or record.
Successful operation does not identify the contractual test, record, exception path, or release authority.
The goal is not to copy the physical reference indefinitely. The goal is to convert relevant intent into an approved, repeatable, inspectable, and releasable production basis.